Project data
Project Characteristics
Taboada WWTP Submarine Outfall
"Work included in the contract for the design and construction of the Taboada wastewater treatment plant. The length of the outfall is 3,910 m (402 m on land and 3,508 m underwater) and the final discharge is outfitted with diffusion ports at a depth of 20 meters. It was built with a thermally fused (butt welded) PE 100 high-density polyethylene (HDPE) pipe with a diameter of 3,000 mm, for a peak flow of 20.3 m3/s."