Project data
Project Characteristics
Werribee sewage treatment plant reuse plant
Through its subsidiary, Tedra Australia Pty Ltd, Tedagua was awarded the design and construction of a recycling plant with a production capacity of 6,000 m3/day – to be increased in two consecutive phases to 15,000 m3/day –, for the production of recycled water for non-drinking residential use in new homes in the outskirts of Melbourne, using ultrafiltration and reverse osmosis processes. The contract included major auxiliary works, such as tanks, pumping stations and recycled water pipelines.