Monforte de Lemos DWTP
Published in InfoENVIRO, january 2013
The study of alternatives and the subsequent draft design were drawn up by Eptisa Servicios de Ingeniería and the final design and construction work was carried out by a consortium made up of Técnicas de Desalinización de Agua, S.A. (TEDAGUA) and Constructora San José, S.A.